Home
  • PLN Home
  • Projects and Jobs
  • Submit Job
  • Editorial Contacts
  • Advertise
  • Subscribe
  • Archives
  • Back Issues
  • Calendar of Events

Enbridge, Chevron Plan $500 Million Gulf Of Mexico Pipeline Expansion

Enbridge Inc. has entered into Letters of Intent with Chevron USA, Inc. which could result in the expansion of its central Gulf of Mexico offshore pipeline system. Enbridge proposes to construct, own and operate the Walker Ridge Gathering System (WRGS) to provide natural gas gathering services to the potential Jack, St. Malo and Big Foot ultra deepwater developments. The estimated cost of the WRGS is $500 million, subject to finalization of scope and definitive cost estimates.

As proposed, the WRGS is expected to include 190 miles of 8-inch, 10-inch and/or 12-inch pipeline at depths of up to 7,000 feet and will have a capacity of 100 MMcf/d.

Patrick D. Daniel, president/CEO, Enbridge Inc. said, “The Gulf of Mexico has long been a major producing region for North American oil and gas, and there is a significant trend toward ultra deepwater developments in the Gulf of Mexico. The Walker Ridge Gathering System will tie in a new supply source for Enbridge’s Manta Ray and Nautilus offshore pipeline systems, enhancing Enbridge’s existing offshore pipeline business and establishing a strategic base for future growth opportunities in the ultra-deep Gulf of Mexico. In addition, the development of the gathering system represents an attractive investment opportunity itself, with risk and return characteristics comparable to Enbridge’s normal business model.”

February 2012
New Equipment
Business News
25th World Gas Conference 2012: Sustaining Future Global Growth
FERC Approves Northeast Supply Link
Questar Holds Open Season For Uinta Basin Expansion
Crestwood/Mountaineer Gathering System Planned
Enterprise, Genesis Finalize Gulf Of Mexico Transportation Agreements
Texas Eastern To Develop Ohio Pipeline Energy Network Project
CRC-Evans/Technip Norway Welding Service Agreement
Enterprise To Build Marcellus/Utica Shale Ethane Pipeline
Enbridge Wins Bakken Pipeline Project Approval
Joint Venture To Build Double Eagle Pipeline
TransCanada’s Keystone XL Job Creation Data

Login

  • Request new password

Buyer's Guide

  • Coatings, pipe joint
  • Compressor components
  • Contractor, pipeline
  • Contractor, river crossing/ directional drilling
  • Directional drilling rigs, large
  • Fittings, valves: plastic
  • Meters, flow
  • Pigs, cleaning
  • Pigs, intelligent
  • Pigs, scraper/ sphere launchers/ traps
  • Scada systems
  • Ultrasonic inspection
  • Vacuum excavators/ potholing
  • Valves, ball
  • Welding systems, automatic
  • Browse all categories